Report

Paul

March 18, 2024 - March 22, 2024

Papers

Title 1: Electric Vehicle-to-Grid (V2G) Net-Metering Prediction based on Federated Learning
Target: IEEE Transaction on Smart Grids / Status: Processing

Title 2: Comprehensive Regression Ensemble-Model Approach for Predictive Vehicle Maintenance in Auto Dealerships
Target: IET / International Journal of Automotive Technology / Status: Processing

Title 3: FIDS-Centive: Hyperledger-based Incentive Mechanism for Federated Intrusion Detection System Clients in IEC 104 Smart Grid
Target: IEEE Transaction on Smart Grids / MS Thesis / Status: Processing

77% Progress
Last Week's Progress

Title 3:
Table Survey - Completed
Run FL development - Centralized Model Working
System Architecture Research Review

This Week Todo's

Title 3:
Run FL development - Centralized Model Working
System Architecture Analysis - Model Drawing and Figure Discussion

Project Progress

AI in Service
=======
Hyperledger Fabric
=======
Pure Scooter

60% Progress
Last Week's Project

AI in Service:
Figma Study + UI / UX
========================
Hyperledger Implementation:
Deploy Chainlink Node
Finalize Chainlink Documentation
Study Decentralized Oracle Network
========================
PureScooter:
Kick-off Meeting
Initial Research

This Week's Project

AI in Service:
UI / UX / Start building application design
- Sales data - Paul
- Predictive - Paul
========================
Hyperledger Implementation:
Deploy Chainlink Node
Finalize Chainlink Documentation
Study Decentralized Oracle Network
========================
PureScooter:
Literature Review on Reward Model
Literature Review on Incentive Mechanism
Research Reward Computation Model Development

Monthly Goals

1. Complete Study on Hyperledger Fabric Deployment using Chainlink
2. Finish Thesis FL Result
3. Finish Thesis Blockchain Result
4. Submit Journal

Annual Goals

1. To attend at least 2 conferences (2/2) - KICS Winter, ICAIIC
2. Submit and publish one SCI Journal (0/1)
3. Finish Thesis