Report

Paul

March 25, 2024 - March 29, 2024

Papers

Title 1: Electric Vehicle-to-Grid (V2G) Net-Metering Prediction based on Federated Learning
Target: IEEE Transaction on Smart Grids / Status: Processing

Title 2: Comprehensive Regression Ensemble-Model Approach for Predictive Vehicle Maintenance in Auto Dealerships
Target: IET / International Journal of Automotive Technology / Status: Processing

Title 3: FIDS-Centive: Hyperledger-based Incentive Mechanism for Federated Intrusion Detection System Clients in IEC 104 Smart Grid
Target: IEEE Transaction on Smart Grids / MS Thesis / Status: Processing

80% Progress
Last Week's Progress

Title 3:
Run FL development - Centralized Model Working
System Architecture Analysis - Model Drawing and Figure Discussion

This Week Todo's

Title 3:
Centralized Completed. Proceed wit
Begin Blockchain Incentive Mechanism. Set-up Hyperledger Besu Simulation.

Project Progress

AI in Service:
UI / UX / Start building application design
- Sales data - Design Initiated
- Predictive - Design Initiated
========================
Hyperledger Implementation:
Deploy Chainlink Node
Finalize Chainlink Documentation
========================
PureScooter:
Literature Review on Reward Model
Literature Review on Incentive Mechanism
Research Reward Computation Model Development

62% Progress
Last Week's Project

AI in Service:
UI / UX / Start building application design
- Sales data - Initialize Design
- Predictive - Initialize Design
========================
Hyperledger Implementation:
Continue finalize Chainlink Documentation
========================
PureScooter:
Literature Review on Reward Model
Literature Review on Incentive Mechanism
Research Reward Computation Model Development

This Week's Project

AI in Service:
UI / UX / Start building application design
- Sales data - Continue
- Predictive - Continue
========================
Hyperledger Implementation:
Continue finalize Chainlink Documentation
========================
PureScooter:
Separate Scope of Works

Monthly Goals

1. Complete Study on Chainlink
2. Finish Thesis FL Result (On-going)
3. Finish Thesis Blockchain Result (Started)
4. Submit Journal

Annual Goals

1. To attend at least 2 conferences (2/2) - KICS Winter, ICAIIC
2. Submit and publish one SCI Journal (0/1)
3. Finish Thesis