Report

Juwon

October 27, 2014 - November 2, 2014

Papers

[C] UWB
[C] Scheduling Algorithm for Downlink Network of Military Satellite Systems
[A] Node Discovery Scheme of DDS using Dynamic Bloom Filters

25% Progress
Last Week's Progress

C] Scheduling Algorithm for Downlink Network of Military Satellite Systems
1. study Opnet & operating special scenario for satellite downlink simulator(LEO)
- I can't do anything about it.

This Week Todo's

C] Scheduling Algorithm for Downlink Network of Military Satellite Systems
1. study Opnet & operating special scenario for satellite downlink simulator(LEO)
- I'll try to this as as possible.

Project Progress

Message Oriented Management and Analysis Tool (Season 3)

13% Progress
Last Week's Project

[A] Make new GUI version
a. remake all sub-window to new concept design.[A]
b. integrate new sub-window xaml code in Main GUI using new docking library.[B]
c. Connect main GUI with code of DB control.[B]

This Week's Project

[A] Make new GUI version
a. make new designer for Node layer edit. [A]
- for user, we need to discuss about this designer as as possible.
- Basic algorithms are already set up when our team had meeting.
-
b. integrate new sub-window xaml code in Main GUI using new docking library.[B]
- already include many sub-window in the main window, but some window still not yet connected with detailed function. This problem also need to fix.
c. Connect main GUI with code of DB control.[B]
- Some table was created by tales. Depend on this updated information, Local DB part also need to change.

Monthly Goals

1. 빚잔치 ( 90% 완료 )
2. MOMAT 3차 개발 완료

Annual Goals

MOMAT 삼성 탈레스에 배포 및 유지 보수 관리