Report

Juwon

November 11, 2014 - November 17, 2014

Papers

[C] Scheduling Algorithm for Downlink Network of Military Satellite Systems

26% Progress
Last Week's Progress

[C] Scheduling Algorithm for Downlink Network of Military Satellite Systems
1. rewrite DWDRR algorithm part
2. make a explain about WDRR's flow chart.

This Week Todo's

[C] Scheduling Algorithm for Downlink Network of Military Satellite Systems
1. study Opnet & operating special scenario for satellite downlink simulator(LEO)
2. make a explain about WDRR's flow chart.

Project Progress

Message Oriented Management and Analysis Tool (Season 3)

49% Progress
Last Week's Project

[A] Make new GUI version
a. make new designer for Node layer edit. [A]
- for user, we need to discuss about this designer as as possible.
- Basic algorithms are already set up when our team had meeting.
-
b. integrate new sub-window xaml code in Main GUI using new docking library.[B]
- already include many sub-window in the main window, but some window still not yet connected with detailed function. This problem also need to fix.
c. Connect main GUI with code of DB control.[B]
- Some table was created by tales. Depend on this updated information, Local DB part also need to change.

This Week's Project

[A] Make new GUI version
a. make new designer for Node layer edit. [A]
- make a prototype about NODE designer
- setup more detailed function for support NODE designer

b. integrate new sub-window xaml code in Main GUI using new docking library.[B]
- sub-windows were inserted to Main GUI
- It need to make connection between them.
- finally, we need to make last window.

c. Connect main GUI with code of DB control.[B]
- * New requirement : Auto padding system.
: on/off
: integrate this algorithm on field window part.

Monthly Goals

MOMAT 3차 개발 완료

Annual Goals

MOMAT 삼성 탈레스에 배포 및 유지 보수 관리