Report

Minhee

September 30, 2024 - October 4, 2024

Papers

Title 1: Design and Implementation of Network Simulator for High Level Naval Ship System
*Under Review

80% Progress
Last Week's Progress

Title : Design and Implementation of Network Simulator for High Level Naval Ship System
- Under review

This Week Todo's

Title 1: Design and Implementation of Network Simulator for High Level Naval Ship System
- Under review

Project Progress

Project 1: Pure Contract
Project 2 : Pure Certificate
Project 3: Pure Wallet

60% Progress
Last Week's Project

Project 1: Pure Contract
# Find errors of Pure Contract's desktop version -> Cmake problem
# Modification code for solving overflow problems with window sizing
# Find overflow error and solve
# Change English version and Modularize language change
# Survey for U.S. Business Registration Number and verification methods
# Try to change pdf viewer pdfx to pdfrx to solve Cmake problem

Project 2: Pure Certificate
# Redesign UI -> Consider functional separation, high visibility

Project 3: Pure Wallet
# Prepare to testing using US networkures to be demonstrated in U.S. companies

This Week's Project

Project 1: Pure Contract
# Find errors of Pure Contract's desktop version
# Modification code for solving overflow problems with window sizing
# Find overflow error and solve
# Survey for U.S. Business Registration Number and verification methods
# Try to change pdf viewer pdfx to pdfrx to solve Cmake problem

Project 2: Pure Certificate
# Redesign UI -> Consider functional separation, high visibility
# Create prototype version using Figma

Project 3: Pure Wallet
# Prepare to testing using US networkures to be demonstrated in U.S. companies

Monthly Goals

1. Find the features Pure Contract need while changing to the English version and solve Cmake problem
2. Configure detailed required features to be demonstrated in U.S. companies

Annual Goals

1. Submit at least two SCI or SCIE journals
{IEEE Access}

2. Try to improve blockchain development capabilities, UI & UX Design