Report

Raihan

October 30, 2024 - November 1, 2024

Papers

Paper 1: BUS-Health: Blockchain-Integrated UAV-enabled Medical Supplies Using Smart Contract for Smart Healthcare
Target: Blockchain: Research and Applications, Elsevier (Major Revision)

Paper 2: Deep-Block: Deep Learning Integrated Blockchain-based Secure and Efficient UAV-BS Deployment
Target: IEEE Transaction on Industrial Cyber-Physical System (Preparation)

Paper 3: BlackIceNet: Explainable AI-Enhanced Multimodal for Black Ice Detection to Prevent Accident in Intelligent Vehicles
Target: IEEE Internet of Things [Submitted]

Paper 4: BLM-Chain: AI-Driven Blockchain for UAV Threat Resistance in IoBT (ICTC: Accepted)

Paper 5: BELL-IDS: Blockchain-Empowered Large Language Model-Aided In-Contextual-Learning Aware IDS in IoFT
Target: IEEE Internet of Things (Submitted)

Paper 6: BFL-Net: Blockchain-Assisted Energy Prediction Based on FL-Integrated LLM for Industry 4.0 (Target: KICS Fall 2024)

Paper 7: BLIND-Twin: Blockchain-Assisted Digital Twin-Enhanced LLM Framework for IIoT Network
(Target: ICC_2025)

Thesis: Blockchain-Assisted Federated Learning-Based Large Language Model for UAV Threat Intelligence in IoFT Network

83% Progress
Last Week's Progress

Paper 2:
* Worked on the connection of the API of ChatGPT for data pre-processing
* Worked on the paper writing

Paper 6: Finish writing the paper using Gumi Industrial Dataset

Paper 7:
* Completed the blockchain-based implementation

Thesis:
* Working on Literature Review writing
* Surveyed papers related to literature survey

This Week Todo's

Paper 2:
* Continue the code for the API connection of ChatGPT 4.0 (Implemented 3.5)
* keep working on the paper writing

Paper 6:
* Submit the paper after fixing the acknowledgment

Paper 7:
* Worked on the simulation part of IDS
* Submit the paper to ICC

Thesis:
* Continue the survey
* Work on the Thesis writing (Introduction part)

Project Progress

Project 1: Physical Internet for Military Logistics

Project 2: GAN-based Industrial Image Data Generation

87% Progress
Last Week's Project

Project 1:
* Created two presentations of the survey paper for the project
* Start working on the survey paper writing based on the assigned role

Project 2:
* Continued reading about the Diffusion technique

This Week's Project

Project 1:
* Further study about PI in the Logistics Supply Chain
* Make the presentation of the surveyed paper for the project

Project 2:
* Continue study on the GAN and Diffusion technique
* Started learning about the implementation of GAN

Monthly Goals

* Try to finish the Journal paper and submit it
* Complete Thesis writing as much as possible
* Submit a conference paper on ICC and WCNC

Annual Goals

* Submit four journal
* At least accept 2 journals
* Attend one international conference and one domestic conference
* Prepare the Thesis