Report

Syamsul

May 6, 2013 - May 12, 2013

Papers

Title 1:
Monitoring System for Current, Voltage, Phase, Power, and Temperature of Electrical Substation System Over PLC Network (for conference)

70% Progress
Last Week's Progress

Title 1:
Monitoring System for Current, Voltage, Phase, Power, and Temperature of Electrical Substation System Over PLC Network (for conference)
- finish the simulation
- collect the data result

This Week Todo's

Title 1:
Monitoring System for Current, Voltage, Phase, Power, and Temperature of Electrical Substation System Over PLC Network (for conference)
- finish the paper

Title 2: project from Samsung Thales
• collect more data

Project Progress

Samsung Thales

90% Progress
Last Week's Project

simulation until 100 nodes and 100 BES

This Week's Project

simulation with variant nodes and BES

Monthly Goals

finish the paper and finish the project

Annual Goals

finish my own paper