Report

NBLong

May 11, 2015 - May 17, 2015

Papers

Title 1: Efficient Cooperative Relaying Selection Scheme for Industrial Multi-Hop Wireless Network. (IEEE Transaction on Industrial Informatics)
Title 2: An Optimal Cooperative Clustering for Relaying Scheme in Green Internet of Things. (Globecom 2015 or WIP ETFA 2015)
Title 3: An Efficient Relaying Selection Scheme in Tactical Multi hop Wireless Networks. (Milcom 2015)

93% Progress
Last Week's Progress

A. Title 1:
A.1. reviewing reference papers.
A.2. preparing the simulation by Opnet Modeler.
A.3. modifying some sections relating to industry.
B. Title 2:
B.1. reviewing 3 reference papers relating to IoT:
• Jun Huang, Yu Meng, Xuehong Gong, Yanbing Liu, Qiang Duan, “A Novel Deployment Scheme for Green Internet of Things”, IEEE Internet of Things Journal, April 2014.
• Pham Tran Anh Quang, Dong-Seong Kim, “An Energy Efficient Clustering in Heterogeneous Wireless Sensor and Actuator Networks”, GC’12 Workshop, 2012.
B.2. writing the system model
B.3. simulating in Opnet Modeler.
C. Title 3:
C.1. modifying the paper for Milcom 2015.
D. Proposal for “UWB in aircraft” project:
D.1. searching papers, documents relating to “UWB in aircraft”, MMS, proposal samples.
D.2. summarizing the contents of documents and papers.

This Week Todo's

A. Title 1:
A.1. reviewing reference papers.
A.2. preparing the simulation by Opnet Modeler.
A.3. modifying some sections relating to industry.
B. Title 2:
B.1. reviewing 3 reference papers relating to IoT:
• Jun Huang, Yu Meng, Xuehong Gong, Yanbing Liu, Qiang Duan, “A Novel Deployment Scheme for Green Internet of Things”, IEEE Internet of Things Journal, April 2014.
• Pham Tran Anh Quang, Dong-Seong Kim, “An Energy Efficient Clustering in Heterogeneous Wireless Sensor and Actuator Networks”, GC’12 Workshop, 2012.
B.2. writing the system model
B.3. simulating in Opnet Modeler.
C. Title 3:
C.1. submitting to Milcom 2015.
D. Proposal for “UWB in aircraft” project:
D.1. waiting for requirements.
Project:

Project Progress

IoT platform

25% Progress
Last Week's Project

o Connecting sensors to kit.
o Programming for kit.

This Week's Project

o Connecting sensors to kit.
o Programming for kit.

Monthly Goals

• Finishing the weekly aims.
• Finishing the subject successfully in all semesters

Annual Goals

• 1 international journal.
• 2 international conferences.