Report

Admin

June 29, 2015 - July 5, 2015

Papers

Title 1: An Optimal Energy Clustering in Industrial Wireless Sensor Networks for Internet of Things. (conference)
Title 2: An Efficient Cooperative Relaying Selection Scheme for Industrial Multi-Hop Wireless Network. (IEEE Transaction on Industrial Informatics)
Title 3: Efficient Relaying Selection Scheme based on TDMA for Military Tactical Multi hop Wireless Networks. (Milcom 2015)

90% Progress
Last Week's Progress

A. Title 1:
A.1. reviewing 3 reference papers relating to IoT:
• Jun Huang, Yu Meng, Xuehong Gong, Yanbing Liu, Qiang Duan, “A Novel Deployment Scheme for Green Internet of Things”, IEEE Internet of Things Journal, April 2014.
• Jau-Yang Chang, “A Distributed Cluster Computing Energy-Efficient Routing Scheme for Internet of Things”, Wireless Personal Communication, December, 2014.
A.2. basing on Prof’s comments to modify: requirements, framework.
A.3. finishing the optimal clustering section.
A.4. finding IEEE 802.15.4, IEEE 802.15.3/3b (UWB) OPNET source code.
B. Writing the report for IoT project:
B.1. MMS, MQTT and combination between MMS and MQTT.
C. Presenting the paper for lab seminar:
C.1. “Design and Performance of Dual-Hop MIMO UWB Transmission” published on IEEE Transaction on Vehicular Technology, 2010.
D. Title 2:
B.1. waiting for the result (status: assigning reviewers).
E. Title 3:
C.1. waiting for the result (status: under-review).

This Week Todo's

A. Title 1:
A.1. reviewing 3 reference papers relating to IoT:
• Jun Huang, Yu Meng, Xuehong Gong, Yanbing Liu, Qiang Duan, “A Novel Deployment Scheme for Green Internet of Things”, IEEE Internet of Things Journal, April 2014.
• Jau-Yang Chang, “A Distributed Cluster Computing Energy-Efficient Routing Scheme for Internet of Things”, Wireless Personal Communication, December, 2014.
A.2. basing on Prof’s new comments to modify: requirements, framework…
A.3. debugging IEEE 802.15.4, IEEE 802.15.3/3c OPNET source code to simulate.
B. Finishing the report for IoT project:
B.1. MMS, MQTT and combination between MMS and MQTT.
B.2. The deadline is this week.
C. Title 2:
C.1. waiting for the result (status: assigning reviewers).
D. Title 3:
D.1. waiting for the result (status: under-review).

Project Progress

virturalization & create capstone design

30% Progress
Last Week's Project

virtualization
- business trip Samsung Thales(setup the Xen VDI)

create capstone design
-

This Week's Project

virtualization
-

create capstone design
- writing final report

Monthly Goals

1. English Study
2. presentation file preparation

Annual Goals

1. English study for presentation & free talking about foreigner
2. writhing to 1 paper