Report

Iyoga

September 30, 2015 - October 6, 2015

Papers

Title 1. (Conf.) Enhanced Replication Scheme using Hot-Standby on Cluster vServer for Naval Combat System. (International Conference 2016)
Title 2. (Journal) Performance Evaluation Multiple Server using Multi-Level Scheduling for Improving Network I/O on Virtualization Environment. (International Journal 2016)
Title 3. (Conf.) Advanced Network Recovery Scheme using Cluster Ethernet for Naval Combat System. (International Conference 2016)
Title 4. (Conf.) Manufacturing Message Specification based on MQTT. (Domestic Conference 2015)

35% Progress
Last Week's Progress

Title 1.Enhanced Replication Scheme using Hot-Standby on Cluster vServer for Naval Combat
-Design Cluster server on Naval Combat System with several requirement.
-Configure cluster server on naval combat system.
-Gathering all the paper which is related to Replication scheme and Cluster.
-Gathering and survey all of paper related to recovery network failures.
-changes the title
Title 4. (Conf.) Manufacturing Message Specification based on MQTT. (Domestic Conference 2015)
-Considering a title
-Learning Code MMS based on MQTT
-Survey several papers
Title 5. (Journal) Challenges in Real-Time virtualization and Predictable Cloud Computing (Seminar)
-preparing all of them for presentation

This Week Todo's

Title 1.Enhanced Replication Scheme using Hot-Standby on Cluster vServer for Naval Combat
-Design Cluster server on Naval Combat System with several requirement.
-Configure cluster server on naval combat system.
-Gathering all the paper which is related to Replication scheme and Cluster.
-Gathering and survey all of paper related to recovery network failures.
-changes the title
Title 4. (Conf.) Manufacturing Message Specification based on MQTT. (Domestic Conference 2015)
-Considering a title
-Learning Code MMS based on MQTT
-Survey several papers
-Writing abstract

Project Progress

DDS SDN & Co-Work with MMS Team & Virtualization

60% Progress
Last Week's Project

DDS SDN:
-Waiting for first requirement

Co-Work with MMS Team:
-Setup environment for MMS Tools.
-Walk in progress of MMS based on MQTT Documentation.
-Update to website

Co-work with Virtualization Team:
-Waiting for next requirement

This Week's Project

DDS SDN:
-Waiting for first requirement

Co-Work with MMS Team:
-Setup environment for MMS Tools.
-Walk in progress of MMS based on MQTT Documentation.
-Update to Team Lead

Co-work with Virtualization Team:
-Waiting for next requirement

Monthly Goals

[B] Finishing Title 1. (Conf.) Enhanced Replication Scheme using Hot-Standby on Cluster vServer for Naval Combat System.(International Conference 2015)
- Survey all paper regarding Replication Scheme
[B] Title 3. (Conf.) Advanced Network Recovery Scheme on Real-Time Cluster Ethernet for Naval Combat System (International Conference 2015)
-Learning several source code
[C]Title 4. (Conf.) Manufacturing Message Specification based on MQTT. (Domestic Conference 2015)
-Finishing to write a paper

Annual Goals

1 Journal SCI papers and 3 conference papers