Report

Minhinfo

November 2, 2015 - November 8, 2015

Papers

Title 1. (Thesis) Communication-Friendly Bandwidth-Aware Routing for Underwater Cognitive Acoustic Sensor Networks

Title 2. (Jour.) Adaptive Spectrum Handoff Scheme for Cognitive Sensor Networks, In Submission, Wireless Personal Communications (IF:0.653).

Title 3. (Jour.) Communication-Friendly Bandwidth-Aware Routing for Underwater Cognitive Acoustic Sensor Networks, In Preparation, IEEE Journal of Oceanic Engineering (IF:1.175).

Title 4. (Conf.) Throughput-Aware Cluster-Based Routing for Underwater Cognitive Acoustic Sensor Networks, In Preparation.

80% Progress
Last Week's Progress

[A]. Title 1
• Writing the proposed scheme

[B]. Title 2
• Under review

[B]. Title 3
• Update Related Work Section

[B]. Title 4
• Read related work papers for simulation comparisons
1. P. Wang, C. Li, and J. Zheng, “Distributed minimum-cost clustering protocol for underwater sensor networks (uwsns),” in ICC ’07. IEEE International Conference on Communications,, June 2007, pp. 3510– 3515.
2. K. Anupama, A. Sasidharan, and S. Vadlamani, “A location-based clustering algorithm for data gathering in 3d underwater wireless sensor networks,” in International Symposium on Telecommunications, August 2008, pp. 343–348.

This Week Todo's

[A]. Title 1
• Writing the proposed scheme, performance evaluation

[B]. Title 3
• Submit to IEEE Journal of Oceanic Engineering

[B]. Title 2
• Under review

[B]. Title 4
• Read related work papers for simulation comparisons
1. P. Wang, C. Li, and J. Zheng, “Distributed minimum-cost clustering protocol for underwater sensor networks (uwsns),” in ICC ’07. IEEE International Conference on Communications,, June 2007, pp. 3510– 3515.
2. K. Anupama, A. Sasidharan, and S. Vadlamani, “A location-based clustering algorithm for data gathering in 3d underwater wireless sensor networks,” in International Symposium on Telecommunications, August 2008, pp. 343–348.

Project Progress

MMS

50% Progress
Last Week's Project

- Modified GUI for MMS on TCP/IP program

This Week's Project

- Continue debugging MMS on TCP/IP program

Monthly Goals

[A]. Title 1
• Finish thesis
[A]. Title 3
• Submit to Ocean Engineering Journal
[A]. Title 4
• Submit to International Conf

[B]. Successfully finish part of project

Annual Goals

[A]. 1 SCI journal and 2 international conferences.
[B]. Finish project