Report

Iyoga

November 16, 2015 - November 22, 2015

Papers

Title 1. (Conf.) Enhanced Replication Scheme using Hot-Standby on Cluster vServer for Naval Combat System. (International Conference 2016)
Title 2. (Conf.) A Comparative Evaluation AMPQ and MQTT Protocol over Critical Mission. (WFCS 2016)
Title 3. (Conf.) Manufacturing Message Specification based on MQTT. (Domestic Conference 2015)
Title 4. (Conf.) VirtRSF: An Evaluation Virtual Cluster over Redundancy and Disaster Recovery (CEIC 2015)

35% Progress
Last Week's Progress

Title 1. (Conf.) Enhanced Replication Scheme using Hot-Standby on Cluster vServer for Naval Combat System. (International Conference 2016)
-Continue writing introduction
-Set up scenarios
Title 2. (Conf.) A Comparative Evaluation AMPQ and MQTT Protocol over Critical Mission. (WFCS 2016)
-Gathering several papers as reference
-Write abstract
Title 3. (Conf.) Manufacturing Message Specification based on MQTT. (Domestic Conference 2015)
-Continue introduction
Title 4. (Conf.) VirtRSF: An Evaluation Virtual Cluster over Redundancy and Disaster Recovery (CEIC 2015)
-Design System
-Simulation

This Week Todo's

Title 1. (Conf.) Enhanced Replication Scheme using Hot-Standby on Cluster vServer for Naval Combat System. (International Conference 2016)
-Continue writing introduction
-Set up scenarios
-Testing
Title 4. (Conf.) VirtRSF: An Evaluation Virtual Cluster over Redundancy and Disaster Recovery (CEIC 2015)
-Design System
-Simulation

Project Progress

Co-Work with MMS Team & Virtualization

60% Progress
Last Week's Project

Co-Work with MMS Team:
-Setup environment for MMS Tools.
-Walk in progress of MMS based on MQTT Documentation.

Co-work with Virtualization Team:
-Waiting for next requirement

This Week's Project

Co-Work with MMS Team:
-Setup environment for MMS Tools.
-Walk in progress of MMS based on MQTT Documentation.

Co-work with Virtualization Team:
-Waiting for next requirement

Monthly Goals

[B] Finishing Title 1. (Conf.) Enhanced Replication Scheme using Hot-Standby on Cluster vServer for Naval Combat System.(International Conference 2016)
- Survey all paper regarding Replication Scheme
-Submitted
[B] Title 2. (Conf.) A Comparative Evaluation AMPQ and MQTT Protocol over Critical Mission. (WFCS 2016)
- Survey all paper regarding Replication Scheme
-Submitted
[B] Title 4. (Conf.) VirtRSF: An Evaluation Virtual Cluster over Redundancy and Disaster Recovery (CEIC 2015)
-Submitted

Annual Goals

1 Journal SCI papers and 3 conference papers