Report

Bigshow081

October 10, 2016 - October 16, 2016

Papers

[1] Performance Evaluation of Virtualization Scheme for Next Generation Naval Combat System Development Tool(Journal of ICROS)
[2] ~~ Message Scheduling Scheme for Log Analysis System(new journal)

[3] Scheduling Periodic Task Graphs for Safety-Critical Time-Triggered Avionic Systems.

[4] A Study on Communication Network Architectures for Southwest Offshore Wind Farm in Korea.

50% Progress
Last Week's Progress

[3] Scheduling Periodic Task Graphs for Safety-Critical Time-Triggered Avionic Systems.
- find new item for new paper related with thales project(Software Log Debugging Tool)

[4] A Study on Communication Network Architectures for Southwest Offshore Wind Farm in Korea.
- Review the paper for Journal of KICS.

This Week Todo's

[2] ~~ Message Scheduling Scheme for Log Analysis System(new journal)
- set up the new message scheduling algorithm concept depend on requirements.

Project Progress

Software Log Debugging Tool

80% Progress
Last Week's Project

- Prepare the seminar abt refactoring with thales
(Extract Method, Inline Method, Inline Temp, Replace Temp with Query and etc...)

- Make btn icon for GUI(open, save, trans and etc...)

This Week's Project

- Make class diagram for additional requirements.
(system resource of each agent, classfied log and non-classfied log filtering, real-time log analysis)

Monthly Goals

- Finish prototype of Software Log Debugging Tool GUI version.

- Resume.

Annual Goals

Finish Software Log Debugging Tool project.

Set up DDS monitoring project.

Internaltional Journal about virtualization.