Report

William

December 5, 2016 - December 11, 2016

Papers

Title 1: Optimal path selection in UWB networks for Avionic systems.

Title 2: A survey on methods for broadband internet access on Trains.

50% Progress
Last Week's Progress

Title 1:
[1] Continuous study and work, analysis and work-in-progress report on the paper.
[2] Studying MATLAB in detail in other to commence simulation.


Title 2:
[2] Seminar presentations was made by me while referring to the aforementioned journal paper.

This Week Todo's

Title 1:
[1] Continuous study and work, analysis and work-in-progress report on the paper.
--parameters and Tables of values.
--Grammartical and readability of the paper.

[2] Studying MATLAB in detail in other to commence simulation.
--To enable me commence simulation works.

Project Progress

virtualization

50% Progress
Last Week's Project

[1] meeting was held and all GUI was shown and analysed by the group.
[2] Individual and collective opinions and inputs on the Analized example GUI(About CreateVM function) was made.

This Week's Project

[1] Based on the conclusion of last week, a unified GUI will now be presented by the team leader while the functions would now be clearly made to enable the coding of the interface.

Monthly Goals

[1] Studying MATLAB and all other essential working tools in detail.
[2] Studying C#

Annual Goals

[1] Submitting and getting accepted to atleast one international Paper/Journal.
[2] Submitting as much domestic papers as possible.
[3] Having a detailed knowledge and use of all the working tools.