Report

Bigshow081

April 17, 2017 - April 23, 2017

Papers

[1] Performance Evaluation of Virtualization Scheme for Next Generation Naval Combat System (Journal of ICROS)

55% Progress
Last Week's Progress

[1] Performance Evaluation of Virtualization Scheme for Next Generation Naval Combat System Development Tool(Journal of ICROS)
- Edit performance evaluation parts.
- Check and edit abstract and introduction.

This Week Todo's

[1] Performance Evaluation of Virtualization Scheme for Next Generation Naval Combat System Development Tool(Journal of ICROS)
- Edit performance evaluation parts.
- Check and edit abstract and introduction.

Project Progress

LoGA & System parameter & DDS monitoring

50% Progress
Last Week's Project

LoGA
- Make manual.

System parameter & DDS monitoring
- DDS study with team member.
- Categorize Listener data for GUI.
- Edit class and use-case diagram for system parameter project.
- Prepare seminar with hanwha systems researchers.

This Week's Project

LoGA
- Demo in Hanwha systems.

System parameter & DDS monitoring
- DDS study with team member.
- Categorize Listener data for GUI.
- Edit class and use-case diagram for system parameter project.
- Prepare seminar with hanwha systems researchers.


Website
- Work@NSL -> Academic Writing : Upload Domestic Journal Format
- Researches -> Naval Combat Systems (Logging System) : Upload LoGA Manual

Monthly Goals

Finish design of System parameter and DDS project.

Annual Goals

Finish LoMIG project.
Finish System parameter and DDS project.
Submit domestic journal paper and international conference paper.