Report

Bigshow081

May 1, 2017 - May 7, 2017

Papers

[1] Performance Evaluation of Virtualization Scheme for Next Generation Naval Combat System (Journal of ICROS)

65% Progress
Last Week's Progress

[1] Performance Evaluation of Virtualization Scheme for Next Generation Naval Combat System Development Tool(Journal of ICROS)
- Edit Conclusion part.
- Edit available function table -> general things and depend on requirments.
- Make requirments table.

This Week Todo's

[1] Performance Evaluation of Virtualization Scheme for Next Generation Naval Combat System Development Tool(Journal of ICROS)
- Edit Conclusion part.
- Edit available function table -> general things and depend on requirments.
- Include descriptions of available function depend on requirments for next generation naval combat systems.
- Include requirments of ISCE(Integrated Ship Computing Systems).

Project Progress

LoGA & System parameter & DDS monitoring

55% Progress
Last Week's Project

System parameter & DDS monitoring
- DDS study with team member.
- Make class diagram for DDS monitoring tool.
- Define the message between DDS monitoring tool and simulator.
(GUID, IP, Domain, Topic and etc..)
- Find and set up function for checking and modification of windows registers and network parameters.


Website
Researches> Naval Combat System> Naval Combat Systems (System Parameter Analysis Tool)
-> Win7 register and network parameter functions new.

This Week's Project

LoGA
- Test for memory management.
- Test for UDP-multicast.

System parameter & DDS monitoring
- DDS study with team member.
- Make class diagram for DDS monitoring tool.
- Make a table for the message will be used between monitoring tool and simulator.

Monthly Goals

Finish design of System parameter and DDS project.

Annual Goals

Finish LoMIG project.
Finish System parameter and DDS project.
Submit domestic journal paper and international conference paper.