Report

Bigshow081

June 5, 2017 - June 11, 2017

Papers

[1] Performance Evaluation of Virtualization Scheme for Next Generation Naval Combat System (Journal of ICROS)

75% Progress
Last Week's Progress

[1] Performance Evaluation of Virtualization Scheme for Next Generation Naval Combat System Development Tool(Journal of ICROS)
- Change the name and content of Tabel 1.
- Change a size of Table 2.
- Change the name of figures(5, 8 ~ 12).

This Week Todo's

[1] Performance Evaluation of Virtualization Scheme for Next Generation Naval Combat System Development Tool(Journal of ICROS)
- Edit Introduction and Conclusion parts.
- Submit the paper.

Project Progress

LoGA & System parameter & DDS monitoring

75% Progress
Last Week's Project

LoGA
- Test in Hanwha systems.
- Debug.

System parameter & DDS monitoring
- Make ListBox in GUI for exhibition of node.
- DDS study with team member.
- Change the schedule depend on the function.


website
NSL > Researches> Military IT> Military IoT
Austal MRV 80 Multirole Vessel - a long range, high speed patrol ship

This Week's Project

LoGA
- Test in Hanwha systems.
- Debug.

System parameter & DDS monitoring
- Make Listview in GUI for exhibition of node status.
- DDS study with team member.

Monthly Goals

Finish test and debugging of LoGA.

Annual Goals

Finish LoGA project.
Finish System parameter and DDS project.
Submit domestic journal paper and international conference paper.