Report

Ckwndgur

November 7, 2017 - November 13, 2017

Papers

[1] Design and performance analysis of Asymmetric Time Division Multiple Access Method based Tactical Radio Communication
(비대칭 다중접속기법 기반의 전술 무선 통신 설계 및 성능분석)

[2] Design and Implementation of Naval Combat System Using Virtualization Technology

[3] Error Detection Scheme of Smart DDS Middleware for Naval Combat System (Thesis, APSCIT)

98% Progress
Last Week's Progress

[1] Asymmetric Time Division Multiple Access Method for Performance Enhancement of Tactical Radio Communication
(비대칭 다중접속기법 기반 전술 무선 통신망의 성능개선)
- Wait review from KIMST.

[2] Design and Implementation of Naval Combat System Using Virtualization Technology
- Wait for journal version of 2017 ACCN.

[3] Error Detection Scheme of Middleware for Smart DDS based Naval Combat System
(Thesis, APSCIT, Defense Science Journal)
- Add some references for related works.
- Modify introduction about related works.
- Change the parts of related works.
- Take an English Correction Service.
- Modify proposed scheme.

This Week Todo's

[1] Asymmetric Time Division Multiple Access Method for Performance Enhancement of Tactical Radio Communication
(비대칭 다중접속기법 기반 전술 무선 통신망의 성능개선)
- Wait review from KIMST.

[2] Design and Implementation of Naval Combat System Using Virtualization Technology
- Wait for journal version of 2017 ACCN.

[3] Error Detection Scheme of Middleware for Smart DDS based Naval Combat System
(Thesis, APSCIT, Defense Science Journal)
- Complete to modify totally this paper.
- Discuss about this paper with Doc. Son.
- Submit this paper to Defense Science Journal.

Project Progress

DDS Debugging Tool, Log Manager and Intelligent Gatherer(LoMIG), NUC

85% Progress
Last Week's Project

[1] DDS Debugging Tool
- Complete to make prototype of this tool for testing each module.

[2] LoMIG

[3] NUC
- Make test-bed to merge three parts(Sohyang, Sunghwa, and I) : cont.
- Complete to develop iOS application.
- Write a semi-final report.

This Week's Project

[1] DDS Debugging Tool
- Merge four parts(Hongyu, Hayeon, Me, Doc. Son)
-> GUI(Hongyu, Hayeon, Me) + Database(Doc. Son)

[2] LoMIG

[3] NUC
- Waiting for feed-back from NUC.

Monthly Goals

[1] Study English.
[2] Complete DDS, NUC project.
[3] Complete additional LoMIG.
[4] Complete to make each function for DDS project.

Annual Goals

[1] Study English and get some public score.
[2] Complete DDS, NUC project.