Report

William

January 4, 2018 - January 10, 2018

Papers

Title 1:
Implementation of Mobile Emergency Report Application using Mobility Sensors(IEEE Sensor Journal).

Title 2:
A Mobile-based Internet of Things Solutions for Animal Monitoring and Tracking: Survey

Title 3:
Implementing Energy-efficient Sensors in Data Centers for Industrial Internet of Things (IoT-SIU 2018).

Title 4:
Ultrawideband Sensor Network Channel Models for Next Generation Wireless Avionic Systems(IEEE Aerospace)

Title 5:
Data Collection Algorithm from Path Constraint Mobile Sensors (Journal Paper-Review Task).

50% Progress
Last Week's Progress

Title 1:
[1] More investigations to enhance the paper was done.
[2] Reference authors was updated.
[3] Paper contents, diagrammatic illustrations and system model was updated.

Title 2:
[1] More investigations to enhance the paper was done.
[2] Awaiting inputs of the co-working members.


Title 3:
[1] The camera-ready copy was completed and transmitted using the MS-DOCs file, as directed.
[2] The camera-ready copy was successfully verified through the PDF eXpress check software.
[3] The paper was finally submitted and copies was also sent to the IoT-SUI Chair.
[4] Visa documentation files awaited from the Conference body.

Title 4:
[1] Awaiting Review comments

Title 5:
[1] Reviewing works in progress regarding contents, grammar, algorithms, system model, and other specs.
[2] Review works to be completed within this week.

This Week Todo's

Title 1:
[1] Continuous work on the enhancement of the paper regarding system model and contents.
[2] Simulation works to compare the technologies will commence.
[2] More Investigations on the contents and current works is on-going.

Title 2:
[1] Continuous work to compare the technologies will commence.
[2] Result writing and conclusion will be done within this month-end.
[3] More Investigations on the contents and current works is on-going.

Title 3:
[1] Awaiting documentations from the IoT-SUI team.
[2] Visa Documentations and application to be done within this week or next.

Title 4:
[1] Paper have been assigned and currently under review.
[2] Awaiting Review comments.

Project Progress

Project Merci, OceanIT(Oil & Gas)

50% Progress
Last Week's Project

[1] Project completed.
[2] Paper Survey works on-going

This Week's Project

[1] Project completed.
[2] Paper Survey works on-going

Monthly Goals

[1] Learning and Practicing all essential simulation and Laboratory working tools in detail.

[2] Completion of all my pending tasks as at when due.

Annual Goals

[1] Submitting and getting accepted to at-least one international conference/Journal paper.
[2] Submitting as much domestic papers as possible.
[3] Having a detailed knowledge and use of all the NSL working tools