Report

Ckwndgur

January 8, 2018 - January 14, 2018

Papers

[1] Design and performance analysis of Asymmetric Time Division Multiple Access Method based Tactical Radio Communication
(비대칭 다중접속기법 기반의 전술 무선 통신 설계 및 성능분석)

[2] Design and Implementation of Naval Combat System Using Virtualization Technology

[3] Error Detection Scheme of Smart DDS Middleware for Naval Combat System (Thesis, APSCIT)

[4] User Interface Design Model for Data Distribution Service

7% Progress
Last Week's Progress

[1] Asymmetric Time Division Multiple Access Method for Performance Enhancement of Tactical Radio Communication
(비대칭 다중접속기법 기반 전술 무선 통신망의 성능개선)
- Wait review from KIMST.
- Request KIMST to inform paper status.

[2] Design and Implementation of Naval Combat System Using Virtualization Technology
- Wait for journal version of 2017 ACCN.

[3] Error Detection Scheme of Middleware for Smart DDS based Naval Combat System
(Thesis, APSCIT, Defence Science Journal)
- Wait review.

[4] User Interface Design Model for Data Distribution Service
- Make a list of requirement.

This Week Todo's

[1] Asymmetric Time Division Multiple Access Method for Performance Enhancement of Tactical Radio Communication
(비대칭 다중접속기법 기반 전술 무선 통신망의 성능개선)
- Wait review from KIMST.

[2] Design and Implementation of Naval Combat System Using Virtualization Technology
- Wait for journal version of 2017 ACCN.

[3] Error Detection Scheme of Middleware for Smart DDS based Naval Combat System
(Thesis, APSCIT, Defence Science Journal)
- Wait review.

[4] User Interface Design Model for Data Distribution Service
- Write Introduction parts (Main current).

Project Progress

DDS Debugging Tool, LoGA, NUC

91% Progress
Last Week's Project

[1] DDS Debugging Tool
- Sort and renew user input(Hayoen and JoongHyuck) : Cont..
- Make our GUI be stable : Cont..
- Merge three parts(Dr. Son, Hayoen and JoongHyuck) : Cont..

[2] LoMIG

[3] NUC
- Finished.

This Week's Project

[1] DDS Debugging Tool
- Sort and renew user input(Hayoen and JoongHyuck) : Cont..
- Make our GUI be stable : Cont..
- Merge three parts(Dr. Son, Hayoen and JoongHyuck) : Cont..
- Send our schedule, QoS list of Open DDS, GUI screenshot, Listeners order.

[2] LoMIG

[3] NUC
- Finished.

Monthly Goals

[1] Study English.
[2] Complete DDS.
[3] Complete to make each function for DDS project

Annual Goals

[1] Study English and get some public score.
[2] Complete Security DDS.