Report

William

February 5, 2018 - February 11, 2018

Papers

Title 1:
Ultrawideband Sensor Network Channel Models for Next Generation Wireless Avionic Systems(IEEE Aerospace)

Title 2:
Real-time Energy-efficient Deployment of Mobile Sensors in Disaster-prone Locations. (extended version for Inderscience journal)

Title 3:
Implementing Energy-efficient Sensors in Data Centers for Industrial Internet of Things (IoT-SIU 2018).

Title 4:
Implementation of Mobile Emergency Report Application using Mobility Sensors(IEEE Sensor Journal).

Title 5:
Sensor-based IoT Solutions for Wildlife Monitoring and Tracking: Survey.

50% Progress
Last Week's Progress

Title 1:
[1] Awaiting Review comments

Title 2: Inderscience journal
[1] Paper was modified after meetings with Professors Kim and Lee.
[2] Paper was submitted accordingly and waiting to be assigned to reviewers.

Title 3:
[1] Awaiting the receipt of my passport and visa documents.
[2] Planning my schedule and the presentation materials for the conference.

Title 4:
[1] Contents modifications.
[2] Inclusion of the mathematical steps.
[3] More investigations of the algorithms and previous works.

Title 5:
[1] More Investigations on the contents and current works is on-going.

This Week Todo's

Title 1:
[1] Paper have been assigned and currently under review.
[2] Awaiting Review comments.

Title 2: Inderscience journal
[1] Paper was submitted accordingly and waiting to be assigned to reviewers.
[2] Awaiting Review comments.

Title 3:
[1] Still expecting the delivery of my travel documents.
[2] Planning my schedule and the presentation materials for the conference.

Title 4:
[1] Continuous work on the enhancement of the paper regarding mathematical steps and contents.
[2] Simulation works to compare the technologies will commence.
[3] More Investigations on the contents and current works is on-going.

Title 5:
[1] More Investigations on the contents and current works is on-going.

Project Progress

Project W-Merci

50% Progress
Last Week's Project

[1] Projects works have been completed.
[2] Paper Survey works for W-Merci on-going
- More investigations to enhance the paper was done.
- Paper Title was updated to suite the survey paper goal.
- Awaiting inputs of the co-working members.

This Week's Project

[1] Project works have been completed.
[2] Paper Survey works on-going.
- More investigations to enhance the paper was done.
- Awaiting inputs of the co-working members.
- Result writing and conclusion will be done within this month-end.

Monthly Goals

[1] Learning and Practicing all essential simulation and Laboratory working tools in detail.

[2] Completion of all my pending tasks as at when due.

Annual Goals

[1] Submitting and getting accepted to at-least one international conference/Journal paper.
[2] Submitting as much domestic papers as possible.
[3] Having a detailed knowledge and use of all the NSL working tools