Report

Masoth

February 5, 2018 - February 11, 2018

Papers

[1] 청각 장애인을 위한 홈 네트워크 기반 모바일 어플리케이션 설계 및 구현
[Design and Implementation of mobile application based on home-network for Hearing-impaired]

[2] 웨어러블 기기를 이용한 사용자 요구 기반의 스마트 어플리케이션 설계 및 구현
[Design and Implementation of Smart Application based on User Request using Wearable Device]

[3] CAN 통신을 이용한 원격전원제어 시스템의 설계 및 구현
[Design and Implementation of Remote Power Control System Using CAN]

20% Progress
Last Week's Progress

[1] Design and Implementation of mobile application based on home-network for Hearing-impaired


[2] Design and Implementation of Healthcare Mobile Application Using Smart Band and Fitbit API

- write an main of paper

[3] Design and Implementation of Remote Power Control System Using CAN

- adjust the schedule
- receive the paper document from him

This Week Todo's

[1] Design and Implementation of mobile application based on home-network for Hearing-impaired


[2] Design and Implementation of Healthcare Mobile Application Using Smart Band and Fitbit API
- write an main of paper
- find a reference

[3] Design and Implementation of Remote Power Control System Using CAN
- wait reply

Project Progress

[1] NUC LINC+ [2] HanHwa

100% Progress
Last Week's Project

[1] NUC LINC+
- fix the fitbit application error
- meeting with prof.Lim
- give the devices to prof.Lim
- Devices are Samsung Gear and Fitbit Smart band

[2] HanHwa
- upgrade the File-Load application
- make the MDI application
- participate in DDS study

This Week's Project

[1] NUC LINC+
- explain application action to NUC

[2] HanHwa
- make the File-Load application save-able
- complete this week's schedule about MDI application

Monthly Goals

[1] Use time wisely

Annual Goals

[1] Improve English Conversation Skills

[2] Do Not Be Late