Ckwndgur

February 12, 2018 - February 18, 2018

Papers

[1] Design and performance analysis of Asymmetric Time Division Multiple Access Method based Tactical Radio Communication
(비대칭 다중접속기법 기반의 전술 무선 통신 설계 및 성능분석)

[2] Design and Implementation of Naval Combat System Using Virtualization Technology

[3] Error Detection Scheme of Smart DDS Middleware for Naval Combat System (Thesis, APSCIT)

[4] User Interface Design Model for Data Distribution Service

15% Progress
Last Week's Progress

[1] Asymmetric Time Division Multiple Access Method for Performance Enhancement of Tactical Radio Communication
(비대칭 다중접속기법 기반 전술 무선 통신망의 성능개선)
- Wait review from KIMST.

[2] Design and Implementation of Naval Combat System Using Virtualization Technology
- Wait for journal version of 2017 ACCN.

[3] Error Detection Scheme of Middleware for Smart DDS based Naval Combat System
(Thesis, APSCIT, Defence Science Journal)
- Wait review.

[4] User Interface Design Model for Data Distribution Service
- Add Introduction parts.
- Add proposed model part.

This Week Todo's

[1] Asymmetric Time Division Multiple Access Method for Performance Enhancement of Tactical Radio Communication
(비대칭 다중접속기법 기반 전술 무선 통신망의 성능개선)
- Wait review from KIMST.

[2] Design and Implementation of Naval Combat System Using Virtualization Technology
- Wait for journal version of 2017 ACCN.

[3] Error Detection Scheme of Middleware for Smart DDS based Naval Combat System
(Thesis, APSCIT, Defence Science Journal)
- Wait review.

[4] User Interface Design Model for Data Distribution Service
- Add related works and design/implementation parts.

Project Progress

DDS Debugging Tool, DDS Security, RT Ware, ICT Center

85% Progress
Last Week's Project

[1] DDS Debugging Tool
- Have a meeting .
- Make our GUI be stable : Cont..
- Merge three parts(Dr. Son, Hayoen and JoongHyuck) : Cont..
- Send our schedule, QoS list of Open DDS, GUI screenshot, Listeners order.

[2] DDS Security
- Study 'status machine of stateful endpoint' with new commer about RTPS Spec.

[3] RT Ware
- Form a teem for Vibration sensor project.
- Survey several references for vibration pattern.

[4] ICT Center
- Discuss with Dr. Moon & TL. Gwon.
- Set up the environment for web-site.
- Make a new site for initial English version.

This Week's Project

[1] DDS Debugging Tool
- Have a meeting .
- Merge three parts(Dr. Son, Hayoen and JoongHyuck) : Cont..
- Make a function of relationship view.
-

[2] DDS Security
- Study 'status machine of stateful endpoint' with new commer about RTPS Spec.

[3] RT Ware
- Survey several references for vibration pattern.
- Make requirements about app.

[4] ICT Center
- Add several boards.

Monthly Goals

[1] Study English.
[2] Final Demo of DDS project(~2/28).
[3] Complete to make each function for DDS project(~2/21).
[4] Complete to apply RT Ware rules.

Annual Goals

[1] Study English and get some public score.
[2] Complete Security DDS.
[3] Get some project for RT Ware.