Report

Ckwndgur

March 5, 2018 - March 11, 2018

Papers

[1] Design and performance analysis of Asymmetric Time Division Multiple Access Method based Tactical Radio Communication
(비대칭 다중접속기법 기반의 전술 무선 통신 설계 및 성능분석)

[2] Design and Implementation of Naval Combat System Using Virtualization Technology

[3] Error Detection Scheme of Smart DDS Middleware for Naval Combat System (Thesis, APSCIT)

[4] Design and Implementation of Real-Time Monitoring Tool for Data Distribution Service

25% Progress
Last Week's Progress

[1] Asymmetric Time Division Multiple Access Method for Performance Enhancement of Tactical Radio Communication(60%)
- Edit this title and contents according to review.
- Wait reply from hanwha guy.
- Add two references

[2] Design and Implementation of Naval Combat System Using Virtualization Technology(100%)
- Wait for journal version of 2017 ACCN.

[3] Error Detection Scheme of Middleware for Smart DDS based Naval Combat System(100%)
(Thesis, APSCIT, Defence Science Journal)
- Wait review.

[4] Design and Implementation of Real-Time Monitoring Tool for Data Distribution Service(25%)
- Search related works and write them more. (Cont.)

This Week Todo's

[1] Asymmetric Time Division Multiple Access Method for Performance Enhancement of Tactical Radio Communication
- Complete to edit until monday.

[2] Design and Implementation of Naval Combat System Using Virtualization Technology
- Wait for journal version of 2017 ACCN.

[3] Error Detection Scheme of Middleware for Smart DDS based Naval Combat System
(Thesis, APSCIT, Defence Science Journal)
- Wait review.

[4] Design and Implementation of Real-Time Monitoring Tool for Data Distribution Service
- Search related works and write them more. (Cont.)

Project Progress

DDS Debugging Tool, DDS Security, RT Ware, ICT Center

50% Progress
Last Week's Project

[1] DDS Debugging Tool(90%)
- Complete to test first demonstration.
- Have a meeting with Hanwha guys

[2] DDS Security(0%)
- Study DCPS to teach new commer.

[3] RT Ware : Vibration Sensonr(10%)
- Make requirements about app. : Cont.

[4] ICT Center(10%)
- Transfer previous boards to new English page.

This Week's Project

[1] DDS Debugging Tool(
- According to feedback, add and modify our tool.
- Complete to display Relationshipview.

[2] DDS Security
- Study DCPS to teach new commer.

[3] RT Ware : Vibration Sensonr
- Complete to make requirements about app. : Cont.

[4] ICT Center
- Transfer previous boards to new English page.

Monthly Goals

[1] Study English.
[2] Final Demo of DDS project(~3/16).
[3] Complete to apply RT Ware rules.
[4] Complete to make new English page as initial version.

Annual Goals

[1] Study English and get some public score.
[2] Complete Security DDS.
[3] Get some project for RT Ware.