Report

Ckwndgur

April 9, 2018 - April 15, 2018

Papers

[1] Design and performance analysis of Asymmetric Time Division Multiple Access Method based Tactical Radio Communication
(비대칭 다중접속기법 기반의 전술 무선 통신 설계 및 성능분석)

[2] Error Detection Scheme of Smart DDS Middleware for Naval Combat System (Thesis, APSCIT)

[3] Design and Implementation of Real-Time Monitoring Tool for Data Distribution Service

65% Progress
Last Week's Progress

[1] Asymmetric Time Division Multiple Access Method for Performance Enhancement of Tactical Radio Communication
- Wait Acceptance.

[2] Error Detection Scheme of Middleware for Smart DDS based Naval Combat System
(Thesis, APSCIT, Defence Science Journal)
- Wait review.

[3] Design and Implementation of Real-Time Monitoring Tool for Data Distribution Service
- Modify total direction from "Error detection" to "Design and implementation". (cont.)
- Edit total figure. (cont.)

This Week Todo's

[1] Asymmetric Time Division Multiple Access Method for Performance Enhancement of Tactical Radio Communication
- Wait Acceptance.

[2] Error Detection Scheme of Middleware for Smart DDS based Naval Combat System
(Thesis, APSCIT, Defence Science Journal)
- Wait review.

[3] Design and Implementation of Real-Time Monitoring Tool for Data Distribution Service
- Modify total direction from "Error detection" to "Design and implementation". (cont.)
- Edit total figure. (cont.)

Project Progress

DDS Debugging Tool, DDS Security, RT Ware, ICT Center

0% Progress
Last Week's Project

[1] DDS Debugging Tool(95%)
- Add two function for Relationshipview.
- Merge three parts(Dr. Son, Joong-Hyuck, Ha-Yeon)
- Make manual as initial version.
- Have a meeting with Hanwha Guy on Thursday.

[2] DDS Security(10%)
- Study concept of DDS Security.

[3] RT Ware
- Sort our project result as available module(DDS Tool).
- Find our resource.

[4] ICT Center
- Transfer previous boards to new English page.

This Week's Project

[1] DDS Debugging Tool(95%)
- Add two function for Relationshipview.
- Set up DDS environment in seminar room.
- Test our tool for reliability on real environment

[2] DDS Security(10%)
- Study concept of DDS Security.
- Present about D-H, AES-GCM algorithm.

[3] RT Ware
- Sort our project result as available module(DDS Tool).
- Find our resource.

[4] ICT Center
- Design new main page.

Monthly Goals

[1] One domestic journal (KIMST)
[2] One international journal (ICEIC Journal)
[3] Complete DDS Debugging Tool

Annual Goals

[1] Study english
[2] Get some project for RT Ware
[3] Complete DDS security