Report

William

September 3, 2018 - September 16, 2018

Papers

WILLIAMS

Title 1:
Real-time Power-splitting with Relay Selection for Wireless Multi-terminal DF-UWB Relay Network. (15th ACM PE-WASUN 2018, Montreal, Canada).

Title 2:
MERCI: A GUI Platform for Target Coverage using Optimized Self-Deploying Mobile Sensors. (IEEE Sensors Journal).

Title 3:
Real-time Energy-efficient Deployment of Mobile Sensors in Disaster-prone Locations. (IJCNDS).

Title 4:
Ultrawideband Sensor Network Channel Models for Next Generation Wireless Avionic Systems(IEEE Aerospace).

50% Progress
Last Week's Progress

Title 1:
[1] Camera-ready paper have been concluded and sent.
[2] Conference registration and payment procedures have been concluded.
[3] Necessary documentations for visa applications from the organizers is awaited.
[4] Necessary documentations for visa applications from myself is been sourced.

Title 2:
[1] Continuous investigations on the mathematical steps
- Algorithm investigations and implementation.
- System model to suit the target system of research.
- Grammar and readability of the paper.

Title 3:
[1] Digital Object Identifier (DOI) for the Journal Paper is now available. (DOI: 10.1504/IJCNDS.2019.10015202).
[2] Awaiting further publication advise/clarification from the journal body.

Title 4:
[1] Substantial enhancements was made according to the reviewers comments.
[2] Final decision is awaited.

This Week Todo's

Title 1:
[1] Camera-ready paper have been concluded and sent.
[2] Conference registration and payment procedures have been concluded.
[3] Necessary documentations for visa applications from the organizers is awaited.
[4] Necessary documentations for visa applications from myself is been sourced.

Title 2:
[1] Continuous investigations on the mathematical steps
- Algorithm investigations and implementation.
- System model to suit the target system of research.
- Grammar and readability of the paper.

Title 3:
[1] Digital Object Identifier (DOI) for the Journal Paper is now available. (DOI: 10.1504/IJCNDS.2019.10015202).
[2] Awaiting further publication advise/clarification from the journal body.

Project Progress

Avionic R&D Project

50% Progress
Last Week's Project

[1] More Investigations on the contents and current works is on-going.
- Reviewed more recent research works.
- Enhanced the system architecture part of the paper

[2] Inputs from others are been expected.

This Week's Project

[1] Learning and Practicing all essential simulation and Laboratory working tools in detail.

[2] Completion of all my pending tasks as at when due.

Monthly Goals

[1] Adapting to all essential simulation and NS Laboratory working tools in detail.

[2] Completion of all my pending tasks as at when due or required.

Annual Goals

[1] Submitting to at-least two/three international conference/Journal paper.
[2] Submitting as much domestic papers as possible.
[3] Having a detailed knowledge and use of all the NSL working tools