Report

Wbsl0319

November 6, 2018 - November 12, 2018

Papers

Sung Hwa Park

[1]동적 PUSH/PULL 기법을 이용한 체계 상태 관리 소프트웨어 설계 및 성능평가
[Design and Performance Evaluation of System State Management Software Using PUSH/PULL Technique]

90% Progress
Last Week's Progress

[1]동적 PUSH/PULL 기법을 이용한 체계 상태 관리 소프트웨어 설계 및 성능평가
[Design and Performance Evaluation of System State Management Software Using PUSH/PULL Technique]

- rename a paper and rewrite its abstract and introduction
- get a confirmation from senior members to modify the design part

This Week Todo's

[1]동적 PUSH/PULL 기법을 이용한 체계 상태 관리 소프트웨어 설계 및 성능평가
[Design and Performance Evaluation of System State Management Software Using PUSH/PULL Technique]

-confirmed by Professor Lee, corrected and submitted.

Project Progress

HanHwa

30% Progress
Last Week's Project

[1]HanHwa(DSS)

- Download the new DBGen manual to study and understand
- summarize the manual

[2]Coding Study

- look for communication techniques to use in chat and scheduling programs
- Have a coding study that describes the code used by the program

[3]Capstone Design(smart livestock project)

- Order Sensors for Communication with Lora
- Have a meeting to study information about smart farms.

This Week's Project

[1]HanHwa(DSS)

- learn about DSS library

[2]Coding Study

- Have a coding study

[3]Capstone Design(smart livestock project)

- learn about Lora and Lora gateway form Ruysadi

Monthly Goals

Annual Goals