Report

Nitahd

November 13, 2018 - November 19, 2018

Papers

Feasibility Analysis of IEEE 802.11ax in Industrial IoT

35% Progress
Last Week's Progress

- acknowledgement revision
- submit the paper to KICS conference
- Pay KICS Conference fee

- install ns3 (network simulator)

This Week Todo's

- prepare the KICS conference presentation
- attend to KICS conference (Nov 17th)

Project Progress

Drone with automatically VTOL

20% Progress
Last Week's Project

- install ROS (Robot operating system)
- learn system of parrot drone (hardware and software)

This Week's Project

- Try to basic programming to make fly the drone
- Learn ROS (robotic operating system)

Monthly Goals

- Understand using the NS3 simulator.
- Understand about routing protocol

Annual Goals

- Able to take a part in at least one Domestic conference.
- Able to take a part in at least one International conference and Journal.