Report

20120117

November 27, 2018 - December 3, 2018

Papers

[1]. Enhanced Real-time Monitoring System for Naval using H.265/HEVC and Bezier Curve Image Reconstruction Scheme

5% Progress
Last Week's Progress

[1]. Enhanced Real-time Monitoring System for Naval using H.265/HEVC and Bezier Curve Image Reconstruction Scheme


- create a proposed scheme performance analysis
- create a result graph
- change a topic

This Week Todo's

[1]. Enhanced Real-time Monitoring System for Naval using H.265/HEVC and Bezier Curve Image Reconstruction Scheme

- adding reference
- Change simulation result picture
- Add an algorithm for bezier curve
- Add an reference for bezier curve

Project Progress

Hanwha system project(DSS team)

5% Progress
Last Week's Project

[1] Coding Study
- Technology research for one-to-many communication.


[2] DB Gen
- Draw a class diagram using UML.
- Analysis every line of code.


[3] Life Bed(Capstone Design)
- two sensor connect with arduino


[4]. Patent
- Existing Technology Investigation
- Familiarizing with reference


[5]. Homepage Update
- Upload photos and lecture materials of ICT seminar
- Upload photos and lecture materials of IEIE conference

This Week's Project

[1] Coding Study
- Technology research for one-to-many communication.


[2] DB Gen
- Draw a class diagram using UML.
- Learn how to work with what features.


[3]Life Bed(Capstone Design)
- get sensor's output
- Increase Heartbeat Sensor Accuracy

Monthly Goals

- complete a Domestic Journal

Annual Goals

- Make own paper