[1] Topic-based network load reduction for data distribution services
[2] Fault Prevention and Prediction Scheme based on Secure DDS for Naval Combat System (33%)
[3] Priority-based Parallel Processing Scheme of Mass Data for Real-time DDS Monitoring System
[4] Not fixed title (reduce discovery and authentication process)
[1] Topic-based Network Load Reduction scheme for Data Distribution Services
- Write abstract part along main idea.
- Write introduction and add two references.
[2] Fault Prevention and Prediction Scheme based on Secure DDS for Naval Combat System (33%)
- Set up environment of Secure OpenDDS(cont. : coding as security version).
[3] Priority-based Parallel Processing Scheme of Mass Data for Real-time DDS Monitoring System (98%)
- receive accepted letter.
[4] Not fixed title
- Study basic process of OPNET modeler. (cont.)
- Have a paper meeting with Juwon. (cont.)
[1] Topic-based Network Load Reduction scheme for Data Distribution Services
- Write whole abstract part.
- Write introduction and add two references. (cont.)
[2] Fault Prevention and Prediction Scheme based on Secure DDS for Naval Combat System (33%)
- Set up environment of Secure OpenDDS(cont. : coding as security version).
[3] Priority-based Parallel Processing Scheme of Mass Data for Real-time DDS Monitoring System (98%)
- Discuss reviewer comments with Dr. Son.
- Edit this paper according to the comments.
[4] Not fixed title
- Study basic process of OPNET modeler. (cont.)
- Have a paper meeting with Juwon. (cont.)
DDS Debugging Tool, DSS(Data Sharing Service, DB Gen), ICT Center
[1] DDS Debugging Tool(100%)
- Inform how to set up environment of DDS Debugging Tool to Hanwha(cont.).
[2] DB Gen(94%)
- According to feedback, edit and modify several classes.
**Homepage responsibility : ICT Center Homepage
- Attend ICTC forum and present/manage our booth.
[1] DDS Debugging Tool(100%)
- Inform how to set up environment of DDS Debugging Tool to Hanwha(cont.).
[2] DB Gen(98%)
- Finish editing and modifying several classes according to feedback.
**Homepage responsibility : ICT Center Homepage
- Write minutes of weekly meeting.
[1] Write international conference about DDS discovery.
[2] Write domestic conference about network load reduction.
[2] Complete DB gen project
[1] Write international journal about network load reduction.