Report

William

May 7, 2019 - May 13, 2019

Papers

WILLIAMS PAUL

Title 1:
Ultrawideband Sensor Network Channel Models for Next Generation Wireless Avionic Systems (IEEE Aerospace).

Title 2:
Integrated DF-Joint-Relaying with MIMO-UWB Scheme in Wireless Underground Sensor Networks.(IEEE Signal Processing Letters)

Title 3:
Novel MIMO-UWB based RTS/CTS Collaboration with Scalable Rate Prediction for Industrial WSNs [IEEE WFCS Conference works - 2019].

Title 4:
MERCI: GUI-based Path-planning Scheme for Disaster-occurrence Monitoring using Adaptive Self-Deploying Mobile Sensors (IEEE Sensors).

Title 5:
Real-time Modification of Unrecoverable RTS/CTS Data Packets in MIL-STD-1553 for Industrial Internet of Battlefield Things. (MILCOM Conference)

50% Progress
Last Week's Progress

Title 1:
[1] Paper publication is completed.

Title 2:
[1]. OUT-OF-JOURNAL SCOPE (instant reject)
[2]. First review-editor's notification prior to reviewer's assignment was received.
[3]. Reworking, to re-submit to another journal.

Title 3:
[1] Preparing documentations for my visa application.
[2] Preparing the conference presentation ppt slides.

Title 5:
[1] Paper Title was updated.
[2] Continuous investigations on the mathematical steps:
- Algorithm, equations and investigations.
- System model to suit the target system of research.
- Grammar and readability of the paper.

This Week Todo's

Title 1:
[1] Paper publication is completed.

Title 2:
[1]. OUT-OF-JOURNAL SCOPE (instant reject)
[2]. First review-editor's notification prior to reviewer's assignment was received.
[3]. Reworking, to re-submit to another journal.

Title 3:
[1] Preparing documentations for my visa application.
[2] Preparing the conference presentation ppt slides.

Title 5:
[1] Paper Title was updated.
[2] Continuous investigations on the mathematical steps:
- Algorithm, equations and investigations.
- System model to suit the target system of research.
- Grammar and readability of the paper.

Project Progress

R&D Works

50% Progress
Last Week's Project

[1] Continuous investigations on the pending paper works that requires re-works and completion.
[2] Assignment of paper paper works to NSL current members for target journal re-submission.
[3] Re-work of a few more papers for re-submission.
[4] Training of New NSL members.

This Week's Project

[1] Continuous investigations on the pending paper works that requires re-works and completion.
[2] Assignment of paper paper works to NSL members for target journal re-submission.
[3] Re-work of a few more papers for re-submission.
[4] Training of New NSL members and re-training of existing members.

Monthly Goals

[1] Adapting to all essential simulation and NS Laboratory working tools in detail.

[2] Working with NSL members for R&D project works

Annual Goals

[1] Submitting to at-least two/three international conference/Journal paper each.
[2] Submitting as many domestic papers as possible.
[3] Having a detailed knowledge and use of all the NSL working tools