Report

Gbtunze

September 16, 2019 - September 22, 2019

Papers

Title 1: Fire Disaster Notification Management(FDNM) for Military Storage and Supply Operation Centers
Target: ICTC Conference,2019.

Title 2: Not yet set, research area already fixed
Target:KICS

17% Progress
Last Week's Progress

Title 1
[1].Reworking on reviewer comments and camera-ready paper is ready for submission.

Title 2
[1].Read research articles on animal tracking systems for National parks and routing in IWSN.
-The algorithm and methods used and their weakness
-The assumption used and how I can Improve
-Suggested future works from review/survey articles
[2].Continue Learning technical writing and practicing NSL technical tools.
[3].To have a research title.

This Week Todo's

Title 1
[1].Submit camera-ready copy by today(16/09/2019)

Title 2
[1].Tune the study to offloading schemes in IIOT
-The algorithm and methods used and their weakness
-The assumption used and how I can Improve
-Suggested future works from review/survey articles
[2].Fix the area and write the abstract.

Project Progress

E-WAMS: Edge Computing-based Wild Animal Monitoring System (Capstone Design Class)

1% Progress
Last Week's Project

[1].Assigned project "E-WAMS"
-Discussion with team members and task assignment.

This Week's Project

E-WAMS
[1].make the proposal, my task is a survey on
-The possibility of using LIDAR in the E-WAMS project.
-How to connect LIDAR to the google coral board
-The effective way of obtaining the relevant source of energy to power and turn ON a lamp that replaces LED

Monthly Goals

[1].To fix a research title and start writing a paper
[2].To master as many MATLAB communication toolboxes and starting learning OPNET modeler.

Annual Goals

[1].To submit at least one paper to SCI journal
[2].Attend international and domestic conferences recommended by NSL
[3].Acquiring knowledge and skills of NSL technical tools.