Report

William

October 14, 2019 - October 20, 2019

Papers

Title 1:
Ultrawideband Sensor Network Channel Models for Next Generation Wireless Avionic Systems (IEEE Aerospace IF: 2.798, Q1)

Title 2:
Novel Detect-and-Forward Joint-Relaying with MIMO-UWB Scheme in Wireless Underground Sensor Networks.(IEEE wireless communications Letters, IF 3.54, Q1)

Title 3:
Achieving Reliable URLLC-based Network in Industrial and Military Embedded Systems. (IEEE ICTC 2019 Jeju Conference)

Title 4:
Tactical & Real-time Remodeling of Unrecoverable Critical-Data in MIL-STD-1553 Avionic Network for Internet of Battlefield Things (IoBT). (2019 IEEE ICC Conference, Dublin)

Title 5:
Adaptive-VFBC Deployment of Obstacle-avoiding Scattered Nodes in ROI Incidence Monitoring (IEEE ACCESS).

Title 6:
Edge-based Path-planning Scheme for Disaster-occurrence Monitoring using Adaptive Self-Deploying Mobile Sensors

50% Progress
Last Week's Progress

Title 1:
[1]. Final Paper publication is in-progress.

Title 2:
[1]. Paper is currently under Peer-to-peer review.
[2]. Awaiting reviewer's review comments.

Title 3:
[1] FINAL Camera-ready copy was uploaded and awaiting paper publications.
[2] Preparations to attend the conference.


Title 4:
[1] Paper was transcribed into the ICC conference required Template.
[2] Simulation works was updated.
[3] continuous readability checks was carried out.

Title: 5
[1] Reworked the systems flowchart.
[2] Included the sensor sink deployment algorithm.
[3] Fine-tuning the paper and to have it submitted soon.

This Week Todo's

Title 1:
[1]. Final Paper publication is in-progress.

Title 2:
[1]. Paper is currently under Peer-to-peer review.
[2]. Awaiting reviewer's review comments.

Title 3:
[1] Confirmation of traveling logistics (Flight and Hotels)
[2] PPT Preparations and other logistics to attend the conference.

Title 4:
[1] Paper was transcribed into the ICC conference required template.
[2] Simulation works was to be updated.
[3] Continuous readability checks was carried out to enhance the paper.

Title: 5
[1] Reworked the systems flowchart.
[2] Included the sensor sink deployment algorithm.
[3] Fine-tuning the paper and to have it submitted soon.

Project Progress

R&D Works and Team Leadership works

50% Progress
Last Week's Project

[1] Continuous investigations on the pending paper works that requires re-works and completion.
[2] Assignment of paper paper works to NSL members for target journal re-submission.
[3] Re-work of a few more papers for re-submission.
[4] Training of New NSL members and re-training of existing members.

This Week's Project

[1] Continuous investigations on the pending paper works that requires re-works and completion.
[2] Assignment of paper paper works to NSL current members for target journal re-submission.
[3] Re-work of a few more papers for re-submission.
[4] Training of New NSL members.

Monthly Goals

1] Adapting to all essential simulation and NS Laboratory working tools in detail.

[2] Working with NSL members for R&D project works

Annual Goals

[1] Submitting to at-least two/three international conference/Journal paper each.
[2] Submitting as many domestic papers as possible.
[3] Having a detailed knowledge and use of all the NSL working tools