Report

William

November 26, 2019 - December 2, 2019

Papers

Title 1:
Experimental DF Joint-Relaying with MIMO-UWB for Wireless Underground Sensor Networks.
(IEEE wireless communications Letters, IF 3.54, Q1)

Title 2:
Real-time Remodeling of Unrecoverable Critical-Data in MIL-STD-1553 Avionic Network for Internet of Battlefield Things (IoBT). (2019 IEEE ICC Conference, Dublin)

Title 3:
Mobile & Adaptive-VFBC Deployment of Obstacle-avoiding Scattered Nodes in ROI Incidence Monitoring (IEEE ACCESS).

Title 4:
Edge-based Path-planning Schemes for Disaster-occurrence Monitoring using Adaptive Self-Deploying Mobile Sensors

50% Progress
Last Week's Progress

Title 1:
[1]. Revising the paper's readability, system model and other grammar structure.
[2]. Writing the Reviewer's comments with respect to the changes made.
[2]. To resubmit within 1st week of December.

Title 2:
[1]. Paper was successfully submitted.
[2]. Awaiting Reviewer's comments and paper decision.

Title 3:
[1]. Paper was successfully submitted.
[2]. Awaiting Reviewer's comments and paper decision.

Title 4:
[1]. Commencing Simulation works for the paper.
[2]. Performing thorough and Continuous readability checks.

This Week Todo's

Title 1:
[1]. Revising the paper's readability, system model and other grammar structure.
[2]. Writing the Reviewer's comments with respect to the changes made.
[2]. To resubmit within 1st week of December.

Title 2:
[1]. Paper was successfully submitted.
[2]. Awaiting Reviewer's comments and paper decision.

Title 3:
[1]. Paper was successfully submitted.
[2]. Awaiting Reviewer's comments and paper decision.

Title 4:
[1]. Commencing Simulation works for the paper.
[2]. Performing thorough and Continuous readability checks.

Project Progress

R&D Works and Team Leadership works

50% Progress
Last Week's Project

[1] Continuous investigations on the pending paper works that requires re-works and completion.
[2] Assignment of paper paper works to NSL members for target journal re-submission.
[3] Re-work of a few more papers for re-submission.
[4] Training of New NSL members and re-training of existing members.

This Week's Project

[1] Continuous investigations on the pending paper works that requires re-works and completion.
[2] Assignment of paper paper works to NSL members for target journal re-submission.
[3] Re-work of a few more papers for re-submission.
[4] Training of New NSL members and re-training of existing members.

Monthly Goals

[1] Adapting to all essential simulation and NS Laboratory working tools in detail.

[2] Working with NSL members for R&D project works

Annual Goals

[1] Submitting to at-least two/three international conference/Journal paper each.
[2] Submitting as many domestic papers as possible.
[3] Having a detailed knowledge and use of all the NSL working tools