Report

Riesa

February 3, 2020 - February 9, 2020

Papers

Title 1:
Enhanced Faulty Node Detection using Interval Weighting Factor for Distributed System (Journal of Communication and Networks) (S) (Status: ED immediate Decision)

Title 2:
Deep-reinforcement Learning for Traffic Signal Optimization in Edge-based Traffic Control System
(Summer Intensive) (Rejected: ELSEVIER Future Generation Computer Systems) --> In revision (Target journal: ELSEVIER Computer and Electricals Engineering)

Title 3:
UAV-assisted Real-time Data Processing using Deep Q-Network for Industrial Internet of Things(ICAIIC) (S)

Title 4: Real-time Traffic Prediction for MEC-aided Road Infrastructure (Winter Intensive)

30% Progress
Last Week's Progress

Title 2:
Revised the related work.
Added simulation results, which are accuracy and delay time of TLCS.
Added sentences that the result can be used in the real environment.


Title 3:
Prepare the presentation material.

Title 4:
- Added five references.
- Revised the abstract and introduction.
Simulation:
- Generated data traffic from SUMO.
- Integrated the SUMO and VEINS as VANET simulator in the OMNET++.
- Added edge computing module into VEINS package with traffic prediction source code.

This Week Todo's

Title 2:
Reduce the explanation of the traffic light system.
Add more explanation of traffic light system optimization using deep reinforcement learning.
Check and correct the whole section before submitting it.
Submit the paper.

Title 3:
Prepare the presentation material.

Title 4:
-Check and correct the system model and algorithm design sections.
Simulation:
- Make a connection between SUMO and OMNET++.
- still making a source code (edge computing module into VEINS package with traffic prediction source code).

Project Progress

Project 1: 3D printing, Project 2: Website management

15% Progress
Last Week's Project

Project 1:
made a connection between server and client application through python OPC UA.


Project 2:
Added some contents of the international conference on the new website.

This Week's Project

Project 1:
Resolve the problem of certificate key on the OPC UA.


Project 2:
Added some contents of the international conference on the new website.

Monthly Goals

Make and Simulate the road network using SUMO that integrated with OMNET++.

Annual Goals

-Able to write at least one in a domestic conference.
-Able to write at least one in international conference and journal.