Report

Kevputrad

April 13, 2020 - April 19, 2020

Papers

Title 1
Dual Fieldbus Industrial IoT Networks using Edge Server Architecture
(Rejected from IEEE Transactions on Industrial Informatics) Elsevier Manufacturing Letter


Title 2
Secure M2M Communication of Industrial IoT using Manufacturing Message Specification (MMS) with Blockchain
Winter Intensive Paper (Elsevier Information Processing Letters)


Title 3
LSTM-based Event Detection Application for M2M MMS over Blockchain (MoB) Communication
For Graduation Thesis

30% Progress
Last Week's Progress

Title 1
- Status: Decision Pending. (30 March 2020)


Title 2
- Finish the transmission time against the number of payloads for both frameworks section.
- Continue on conclusion and future works.
- Check the readability of the paper.
- Finish the paper by this week.


Title 3
- Change the system design of clients with MMS over Blockchain. The clients not directly connected with the MMS server, but only with the Blockchain network.

This Week Todo's

Title 1
- Status: Accepted. (10 April 2020)


Title 2
- Add other references.
- Use the template of the target journal.
- Submit to correction service by the end of this week.


Title 3
- Change the title.
- Continue the introduction and related work.
- Start coding LSTM for event detection based on IoT sensors public dataset.

Project Progress

MMS for Industrial IoT, E-WAMS: Edge Computing-based Wild Animal Monitoring System (Capstone Design Class), 3D Printing Conception Company, and International Conference Section

10% Progress
Last Week's Project

3D Printing
- Successfully combined the codes of the sensors and LabView 2018 using VISA.
- Make a GUI of the attached sensors and the connection status of the printer and PC in the LabView 2018.
- Got the EZCAD3 SDK, continue in analyzing the source codes and made our own software.


International Conference Section
- Check the format of paper list and correct the typo
- Inform to members to update their paper in same format.
- Continue edit title's format that already published.

This Week's Project

3D Printing
- Make a report for the company.
- Activate the software license using JCZEZCAD key USB.
- Change the icon, logo, and text of the software.


International Conference Section
- Check the format of paper list and correct the typo
- Inform to members to update their paper in same format.
- Continue edit title's format that already published.

Monthly Goals

- Finish the winter intensive and submit the chosen journal.
- Find a suitable method for event detection (RBF or LSTM).
- Successfully connect the sensor (Arduino) to LabView through serial communication.
- Make a good UI consists of many sensors and the connection status of the 3D Printing.

Annual Goals

- Able to submit and take a part in at least one Domestic conference.
- Able to submit and take a part in at least one International conference and Journal.