Williams Paul
Title 1:
DF Joint Relaying with MIMO-Ultrawideband for WUSNs. (Winter-Intensive)
Title 2:
(Thesis/Dissertation)
Title 3:
Real-time Remodeling of Unrecoverable Critical-Data in MIL-STD-1553 Avionic Network for Internet of Battlefield Things (IoBT). (2020 IEEE-ETFA Conference)
Title 4:
Communication Handover for Multi-Dimensional UAVs in ROI using MIMO-Ultrawideband (ICAIIC 2020)
Title 1:
1. Submitted to IEEE Transactions on Very Large Scale Integration (VLSI) Systems and awaiting review comments.
2. Currently under peer review.
Title 2:
[1]. Revising the paper's readability.
[2]. Working on system model and proposed techniques.
[3]. Commencing Simulation works for the paper.
Title 3:
[1]. Re-Working the system model and proposed techniques.
[2]. Continuous Simulation works on the paper is on-going.
Title 4:
[1]. Paper Publication notifications has been received.
NSL Activities:
[1]. Re-visiting the NSL website and updating the papers and website information.
[2]. Training of New NSL members and re-training of the existing NSL members.
Title 1:
1. Submitted to IEEE Transactions on Very Large Scale Integration (VLSI) Systems and awaiting review comments.
2. Currently under peer review.
Title 2:
[1]. Revising the paper's readability.
[2]. Working on system model and proposed techniques.
[3]. Commencing Simulation works for the paper.
Title 3:
[1]. Re-Working the system model and proposed techniques.
[2]. Continuous Simulation works on the paper is on-going.
Title 4:
[1]. Paper Publication notifications has been received.
NSL Activities:
[1]. To continue to re-visit the NSL website and updating the papers and website information.
[2]. To continue to train the New NSL members and to re-train the existing NSL members.
E-WAMS (W-MERCI EXTENSION) and Team Leadership works
E-WAMS (W-MERCI EXTENSION):
[1]. To email the Teams in Nigeria (FUTA) and Uganda (MUSB) and share the files with them.
[2]. To commence requirement analysis for the purpose of project deployment as suggested by Prof. Lee.
[3]. To also facilitate formation of teams and co-working with them based on their requirement analysis.
Team Leadership works:
[1] Continuous investigations on the pending paper works that requires re-works and completion.
[2] Assignment of paper paper works to NSL members for target journal re-submission.
[3] Re-work of a few more papers for re-submission.
E-WAMS (W-MERCI EXTENSION):
[1]. Reminder email was sent and response was received. We are awaiting the signed documents from Uganda (MUSB).
[2]. To commence requirement analysis for the purpose of project deployment as soon as documents are received.
[3]. Yet to receive the written proposal documents for the project from Prof. Lee as promised.
Team Leadership works:
[1] Continuous investigations on the pending paper works that requires re-works and completion.
[2] Assignment of paper paper works to NSL members for target journal re-submission.
[3] Re-work of a few more papers for re-submission.
[1] Adapting to all essential simulation and NS Laboratory working tools in detail.
[2] Working with NSL members for R&D project works
[1] Submitting to at-least two/three international conference/Journal paper each.
[2] Submitting as many domestic papers as possible.
[3] Having a detailed knowledge and use of all the NSL working tools