Title 3: Efficient UAV Deployment Strategy for Energy-Efficient Routing Protocol using Monarch Butterfly Optimization Algorithm
- Target Journal: IET Communications Journal
Title 4: Enhancing Localization Accuracy in Indoor Industrial Enviornment using Metaheuristic Algorithm
- ICTC 2020
Title 5: Hardware-in-the-Loop 3D Printer Oxygen Agent Monitoring Program using LabView
- Journal Publication (3D Project Journal Paper)
Title 1: Secure Ground Control Station-based Routing Protocol of UAV Network
- Accepted in ICTC 2019
Title 2: Monarch Butterfly Optimazation on DV based Positioning in Indoor Industrial Environment
- Accepted in KICS Fall 2019
Title 3: Efficient UAV Deployment Strategy for Energy-Efficient Routing Protocol using Monarch Butterfly Optimization Algorithm
- Finish the simulation codes
- Continue writing the paper
Title 4: Enhancing Localization Accuracy in Indoor Industrial Enviornment using Metaheuristic Algorithm
- Write the introduction
- Read related works
- Finish the paper
Title 5: Hardware-in-the-Loop 3D Printer Oxygen Agent Monitoring Program using LabView
- Deadline this week (Urgent)
- Execute the program in actual testing using FDM 3D printer
- Write the result.
Title 3: Efficient UAV Deployment Strategy for Energy-Efficient Routing Protocol using Monarch Butterfly Optimization Algorithm
- Try the debugged the code, seems like it's effective. Continue building the simulation.
Title 4: Enhancing Localization Accuracy in Indoor Industrial Enviornment using Metaheuristic Algorithm
- Done with system model and conclusion
-Start writing the rest of the paper
Title 5: Hardware-in-the-Loop 3D Printer Oxygen Agent Monitoring Program using LabView
- Done.
- Also done with compiling the previous technical reports about the project.
3D Printing Monitoring Development
- Start testing the program into a FMS type 3D printer, the program is working according to what's expected.
- Continue writing the journal paper about the project
- Finalizing the requirements.
- Present the final presentation
- Present the video of the actual testing execution.
- Finish the Winter intensive simulation and paper.
- Meet the deadline for the Laboratory Project
- Write two SCI journals
- Submit a paper on
(1) International - 85%
(1) Domestic conference paper - 10%
- Finish the 3D project : 100%