Williams Paul
Title 1:
Characterizing a Hybrid MIMO-Ultrawideband RF with Joint Relaying for Industrial WU-RSNs. (Winter-Intensive).
Title 2:
(Thesis/Dissertation)
Title 3:
Real-time Remodeling of Unrecoverable Critical-Data in MIL-STD-1553 Avionic Network for Internet of Battlefield Things (IoBT). (2020 IEEE-ICTC Conference).
Title 4:
Novel Auto-Discovery-DDS Scheme for Large-scale Distributed Collaborative Simulation (Short Journal).
Title 5:
Open Issues for Industrial Deployment of Next Generation Combat UAVs (Short Journal).
Title 1:
[1]. Paper was rejected (OUT OF SCOPE).
[2]. Reworked the paper and re-submitted to IEEE Systems Journal.
Title 2:
[1]. updated my thesis/dissertation on KIT 'dCollection program platform.
[5]. To carry-out further necessary steps as instructed by the School management.
Title 3:
[1]. Paper is ready to submit.
[2]. I will seek submission-approval from Prof. Kim until the end of this new week.
Title 4:
[1]. Paper was re-visited.
[2]. System model and algorithms was finalized.
[3]. Paper's readability is continuous.
[4]. Simulation works in on-going.
Title 5:
[1]. Initial stage of writing and investigations is in progress.
[2]. System model to be commenced in this week.
NSL Activities:
[1]. Re-visiting the NSL website and updating the papers and website information.
[2]. Training of New NSL members and re-training of the existing NSL members.
Title 1:
[1]. Paper was rejected (OUT OF SCOPE).
[2]. Reworked the paper and re-submitted to IEEE Systems Journal.
Title 2:
[1]. updated my thesis/dissertation on KIT 'dCollection program platform.
[5]. To carry-out further necessary steps as instructed by the School management.
Title 3:
[1]. Paper is ready to submit.
[2]. I will seek submission-approval from Prof. Kim until the end of this new week.
Title 4:
[1]. Paper was re-visited.
[2]. System model and algorithms was finalized.
[3]. Paper's readability is continuous.
[4]. Simulation works in on-going.
Title 5:
[1]. Initial stage of writing and investigations is in progress.
[2]. System model to be commenced in this week.
NSL Activities:
[1]. Re-visiting the NSL website and updating the papers and website information.
[2]. Training of New NSL members and re-training of the existing NSL members.
E-WAMS (W-MERCI EXTENSION) and Team Leadership works
E-WAMS (W-MERCI EXTENSION):
[1]. To email the Teams in Nigeria (FUTA) and Uganda (MUSB) and share the files with them.
[2]. To commence requirement analysis for the purpose of project deployment as suggested by Prof. Lee.
[3]. To also facilitate formation of teams and co-working with them based on their requirement analysis.
Team Leadership works:
[1]. Continuous investigations on the pending paper works that requires re-works and completion.
[2]. Assignment of paper paper works to NSL members for target journal re-submission.
[3]. Re-work of a few more papers for re-submission.
E-WAMS (W-MERCI EXTENSION):
[1]. We are waiting the signed documents from Uganda (MUSB).
[2]. To commence requirement analysis for the purpose of project deployment as soon as documents are received.
[3]. Yet to receive the written proposal documents for the project from Prof. Lee as promised.
Team Leadership works:
[1]. Continuous investigations on the pending paper works that requires re-works and completion.
[2]. Assignment of paper paper works to NSL members for target journal re-submission.
[3]. Re-work of a few more papers for re-submission.
[1]. Having a detailed knowledge and use of all the NSL working tools.
[2]. Working with colleagues based on research works and project works.
[1]. Submitting to at-least two/three international conference/Journal paper each.
[2]. Submitting as many domestic papers as possible.
[3]. Having a detailed knowledge and use of all the NSL working tools.