Report

20205043

May 22, 2022 - May 29, 2022

Papers

Title 1: Key Wearable Device Technologies Parameters for Innovative Healthcare Delivery in B5G Network: A Review
Target: IEEE Access {Accepted}
Title 2: Tractable Minacious Drones Aerial Recognition and Safe-Channel Neutralization Scheme for Mission Critical Operations
Target: IEEE Industrial Informatics/ETFA 2022
Title 3: ITCM: IT Convergence Model for Real-Time Ubiquitous Vaccination Verification and Authentication
Target: ICTC 2021/ACM Info System
Title4: PID: Pervasive Intrusion Detection Scheme to Mitigate Sensor Attacks on UAV Networks
Target: Winter Intensive/KICS Summer Conference 2022
Title5: VisioNET Dataset: An Aerial Dataset for Scenario-Based Multi-Drone Detection and Identification Research
Target: IEEE Transactions on Aerospace and Electronic Systems

95% Progress
Last Week's Progress

Title 1: Updated paper status on NSL website and other digital media handles for a wide readership.
Title 2: (a) Continued with the result and discussion, and the conclusion section of the paper
(b) Finalized paper and submitted to IEEE Industrial Informatics
Title 4: (a) Continued with the expanded modification
Title 5: (a) Commenced simulation and result discussion section
-Prepared for the Metaverse workshop
-Attended classes and respond to emerging assignments and quizzes
-Attended ICC 2022 conference virtually

This Week Todo's

-Title 2: (a) Modifying paper to maximum paper requirement by IEEE TII based on editor's comment
(b) To re-submit paper
Title 4: (a) To write result discussion and performance evaluation section

Title 5: Continue with extended simulation and model training

-Preparing for Metaverse workshop Presentation
-To attend class and respond to emerging assignments and quizzes
-To have a brainstorming session on WQM Project

Project Progress

Water Quality Monitoring

5% Progress
Last Week's Project

-Continued investigating on WQM Systems
-Continued researching about the concepts and problems

This Week's Project

-To get the project scope, timeline, and target from Supervisor
-To set a chart course and work breakdown schedule (WBS) based on the Project timeline and target
-To have brainstorming sessions with team members

Monthly Goals

-Improve on use of MATLAB for Deep Learning
-To conclude Title 3 paper and submit for possible publication
-To conclude Title 2 and 5 and submit for possible publication

Annual Goals

-At least 4 international journal Acceptance (2 achieved) and 8 submissions (4achieved)
-At least 4 conference attendance; 2 International (1 Achieved) and 2 domestic (1achieved)