July 14, 2014 - July 20, 2014

Papers

[C] UWB
[C] Scheduling Algorithm for Downlink Network of Military Satellite Systems

15% Progress
Last Week's Progress

[*] "Time-Critical MAC Protocol based on IEEE 802.15.4 IR-UWB optimized for Industrial Wireless Sensor Networks"
--> OPNET & NS2 익히는 중(10%) => 지난주 아무것도 하지 못함.

[C] Scheduling Algorithm for Downlink Network of Military Satellite Systems
-->리뷰 코멘트 확인 및 개선점 확인 (15%)

This Week Todo's

[*] "Time-Critical MAC Protocol based on IEEE 802.15.4 IR-UWB optimized for Industrial Wireless Sensor Networks"
--> OPNET & NS2 공부(10%)

[A] Power Efficient Ultra Wide Band Based Wireless Body Area Networks with Narrowband Feedback Path
--> 금주 연구실 세미나 준비

[C] Scheduling Algorithm for Downlink Network of Military Satellite Systems
--> 군사용 위성에 대한 기본적인 가정 자체의 결함이 많다는 지적을 보완하기 위하여, Multi-satellite observation integrated scheduling method oriented to emergency tasks and common tasks를 통해 논문의 Intro 파트의 보완 진행.

Project Progress

Message Oriented Management and Analysis Tool

95% Progress
Last Week's Project

[A] UI팀과 나눈 업무관련 수시로 확인
1. 설정된 GUI의 스타일을 저장하고, 재 부팅 시 저장된 스타일 로드(Rizal)[A] (30 -> 50%)
-> 협의 하에 차기 작업으로 연기
2. 전 윈도우간 연동 지원 [A] (30 -> 100%)
3*(중요). 요구사항 표 기반 지속적인 디버깅 (RIzal & 진용)[A] (10 -> 40%)

[B] 디자이너 개선 및 통합 진행
1. 1,2,3 통합[A] (10 -> 50%)
-> 중간 계획 변경. 폐기
2. Layer 표기용 Tree View 개발[A] (0 -> 100%)
-> 완료. 컨텍스트 작업까지 완료
3. 추가적인 디자이너 가젯 개발 (줌인, 줌아웃, 선택영역 인쇄)[B] (0 -> 10%)

This Week's Project

[A] UI팀과 나눈 업무관련 수시로 확인
1*(중요). 요구사항 표 기반 지속적인 디버깅 (RIzal & 진용)[A] (40%)
2. 신규 발생한 GUI 상의 요구사항 반영 여부 확인 (0%)

[B] 디자이너 개선 및 통합 진행
1. 추가적인 디자이너 가젯 개발 (줌인, 줌아웃, 선택영역 인쇄)[B] (10%)
2. 2번 디자이너 오브젝트 초기설정 변경( 자동배치 자동 연결 기능 추가)[A] (0%)

Monthly Goals

연구실 세미나(7.18)
: Power Efficient Ultra Wide Band Based Wireless Body Area Networks with Narrowband Feedback Path
MOMAT 시연(7.28)

Annual Goals

MOMAT 삼성 탈레스에 배포 및 유지 보수 관리