Report

20205043

July 11, 2022 - July 17, 2022

Papers

Title 1: Tractable Minacious Drones Aerial Recognition and Safe-Channel Neutralization Scheme for Mission Critical Operations
Target: IEEE Industrial Informatics (Rejected: Out-of-Scope)/ETFA 2022 (Accepted)
Title 2: ITCM: IT Convergence Model for Real-Time Ubiquitous Vaccination Verification and Authentication
Target: ICTC 2021/ACM Info System
Title3: PID: Pervasive Intrusion Detection Scheme to Mitigate Sensor Attacks on UAV Networks
Target: Winter Intensive/KICS Summer Conference 2022 (Accepted)
Title4: VisioNET Dataset: An Aerial Dataset for Scenario-Based Multi-Drone Detection and Identification Research
Target: IEEE Transactions on Aerospace and Electronic Systems
Title 5: SimNet: UAV-Integrated Sensor Nodes Localization for Communication Intelligence in 6G Networks
Target: APCC 2022 (Submitted)
Title 6: Drone Warfare: Reinforcement Learning Detection Technique for UAV-Ghost Gun Terror Operations
Target: MILCOM 2022 (Draft Submitted)
Title 7: Hierarchical Intrusion Detection System for Secured Military Drone Network: A Perspicacious Approach
Target: MILCOM 2022 (Submitted-Co working with Vivian)
Title 8: Drone Transportation System Security: A TEAS Paradigm for Countering Invasion
Target: IET Intelligent Transport System (Under review)
Title 9: Connected Innovation Intelligence for Smart-Based Water Quality Monitoring System in IIOT Application
Target: Summer Intensive/ICTC 2022/IEEE IoT

20% Progress
Last Week's Progress

Title 5: Corrected paper error and Submitted on EDAS Platform
-Title 6: (a) Ran simulation and plagiarism check on paper
(b) Finalized paper and submitted on EDAS platform
-Prepared Project proposal on WQMS
-Presented Summer Intensive proposal

This Week Todo's

Title 3: To continue paper content modification
Title 4: To debug simulation code and re-run paper simulation
Title 6: -To write related works and system methodology section of paper
-To run simulation on dataset
Title 7: Awaiting review comments from conference organizers
Title 8: Awaiting review comment
Title 9: To continue with related works and system design

Project Progress

Water Quality Monitoring

15% Progress
Last Week's Project

-Had brainstorming sessions with team members
-Prepared project proposal
-Continued with paper writing

This Week's Project

-To modify project proposal after ratification
-To have a brainstorming session on project feasibility study

Monthly Goals

-Continue Learning on reinforcement learning
-Continue to study on sematic communication and connecting intelligence
-To finalize titles 2, 3, and 4 and submit

Annual Goals

-To submit at least 8 journals and 4 publications (50% accomplished)
-To attend at least 6 conferences (75%) accomplished