[C] UWB
[C] Scheduling Algorithm for Downlink Network of Military Satellite Systems
[A] Node Discovery Scheme of DDS using Dynamic Bloom Filters
[C] Scheduling Algorithm for Downlink Network of Military Satellite Systems
-> WDRR's fig and description are unsuitable, so I found paper "I-DWRR - An Insolvency Enabled Scheduling Scheme extending Deficit Weighted Round Robin". Using this paper, I can improve my one.
[A] Node Discovery Scheme of DDS using Dynamic Bloom Filters
-> set up the answer sheet for patent. ( ~.5)
[*] MOMAT 프로젝트 종료로 우선순위 변경. (프로젝트 -> 논문)
[A] Node Discovery Scheme of DDS using Dynamic Bloom Filters
-> I need to make answer sheet for patent. ( ~.5)
[C] Scheduling Algorithm for Downlink Network of Military Satellite Systems
-> 1. Change unclear figure
2. Insert more detailed explain in the related work part.
Message Oriented Management and Analysis Tool
[A] Debug. (over 50 hours)
[A] Project was finish(~.1).
[A] I need to solve little bug until 8.4
[B] I need to make class structure document until 8.26
[C] I need to make new function for MOMAT Designer on my part.
휴가
논문 수정 마무리
학기 시작 전까지 모맷 추가 요구사항 해결
MOMAT 삼성 탈레스에 배포 및 유지 보수 관리